Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search
Angehrn AG – Fertigung

Drop forge and hot press plant for precision parts made of steel, stainless steel and titanium in economical series production.

Angehrn AG Logo

Angehrn AG Umformtechnik

Degersheim SG (CH)New on Amplifa

1907Founded
approx. 10 kgMax. piece weight steel
approx. 1 kgMax. piece weight titanium
Series productionLot sizes from prototype to series

About Angehrn AG Umformtechnik

Angehrn AG Umformtechnik in Degersheim is a Swiss manufacturer specialising in drop forging and hot pressing of high-strength structural components. From steel alloys, rust- and acid-resistant stainless steels and titanium, the company produces precision parts with piece weights ranging from a few grams to around 10 kg (titanium up to approx. 1 kg). The value chain includes, in addition to hot pressing, in-house heat treatment, toolmaking, raw material cutting and mechanical finishing by drilling, milling, grinding, polishing, deburring and cleaning. In addition, purchased parts are procured and ready-to-install, function-tested assemblies are assembled. Customers come from general mechanical engineering, medical technology (medical implants), pressure equipment manufacturing and rail infrastructure, including HPQ qualification for Deutsche Bahn. From a locksmith's shop founded in 1907, an internationally active company has evolved that delivers its products worldwide by truck, rail, ship or air freight.

Site
Degersheim
Processes
Drop forging, Hot pressing, Partial forming on larger workpieces, Heat treatment, Toolmaking, Drilling (finishing), Milling (finishing), Grinding
Materials
1.0553, S355J0 (St52-3), 1.7131, 16MnCr5, 1.1191, C45E, 1.7227, 42CrMoS4, 1.8159, 51CrV4, 1.4301, X5CrNi18-10, 1.4435, X2CrNiMo18-14-3, 1.4571, X6CrNiMoTi17-12-2
Certificates
SN EN ISO 9001:2015, ISO 13485, AD 2000-Merkblatt W 0, Pressure Equipment Directive 2014/68/EU, HPQ - Manufacturer-related product qualification (Deutsche Bahn AG, TL 889.0125, AD 2000-Merkblatt W 0 (TÜV Süd), Pressure Equipment Directive 2014/68/EU (TÜV Süd), HPQ Deutsche Bahn AG (valid until 30.06.2026)
Founded
1907
Industries
General mechanical engineering, Medical technology / Medical implants, Rail infrastructure (Deutsche Bahn, track materials), Pressure equipment manufacturing
  1. 01

    Design/Development

  2. 02

    Toolmaking

  3. 03

    Raw material cutting

  4. 04

    Drop forging/Hot pressing

  5. 05

    Heat treatment

  6. 06

    Finishing (drilling, milling, grinding, polishing, deburring, cleaning)

  7. 07

    Assembly of ready-to-install assemblies incl. functional testing

  8. 08

    Warehousing and shipping

Locations

Standort Degersheim

Degersheim

CH

Production site: drop forge, stamping, heat treatment, toolmaking, machining, assembly, administration

Part weight / size
Steel approx. 10 kg, stainless steel approx. 8 kg, titanium
Lot size
Series production
Materials
Steel alloys, stainless steels, titanium
  • Presses for drop forging/hot pressing
  • Heat treatment facility
  • Toolmaking
  • Machining department

Components and Competencies

Drop-forged part
Drop-forged partDrop forging · Mechanical engineering
Finished precision part
Finished precision partMachining · Mechanical engineering
Ready-to-install assembly
Ready-to-install assemblyAssembly · Mechanical engineering

Inside the production

Production halls of Angehrn AG Umformtechnik
Production halls of Angehrn AG Umformtechnik
Forging: precision in every blow
Forging: precision in every blow
Finishing: drilling, milling, grinding, polishing
Finishing: drilling, milling, grinding, polishing
Ready-to-install assemblies
Ready-to-install assemblies
Degersheim plant premises
Degersheim plant premises

Industries

General mechanical engineeringMedical technology / Medical implantsRail infrastructure (Deutsche Bahn, track materials)Pressure equipment manufacturing

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Drop forgingForming––a few grams – approx. 10 kg (steels)Series productionSteel alloys, Stainless steels, Titanium
Hot pressingForming––a few grams – approx. 10 kg (steels)–Steel alloys, Stainless steels, Titanium
Partial forming on larger workpiecesForming––––unalloyed and alloyed steels
Heat treatmentHeat treatment–––––
ToolmakingEngineering–––––
Drilling (finishing)Machining––––Steel, Stainless steel, Titanium
Milling (finishing)Machining––––Steel, Stainless steel, Titanium
GrindingMachining––––Steel, Stainless steel, Titanium
PolishingSurface––––Steel, Stainless steel, Titanium
DeburringSurface––––Steel, Stainless steel, Titanium
Degreasing and cleaningSurface–––––
Assembly of ready-to-install assemblies (incl. procurement of springs, pins, screws,Assembly–––––
StampingForming–––––
Raw material cuttingForming–––––
Functional testing of assembliesTesting–––––

1 Anlagen & Maschinen

MachineManufacturer / modelQuantityWorking areaYear builtSite
Press (heavy-duty presses for drop forging/hot pressing)––––Degersheim

Additional services

Drop forging / Hot pressingHeat treatmentToolmakingMachining / Finishing (drilling, milling, grinding, polishing, degreasing, cleaning)DeburringAssembly of ready-to-install assembliesProcurement of purchased parts (springs, pins, screws)Design/Development of componentsWarehousing and logistics (truck, rail, ship, air freight)Traceability for safety-relevant products and medical technology

Reference customers

Deutsche Bahn AG (HPQ qualification for track material products)

Quality

A process-oriented quality management system according to SN EN ISO 9001:2015 monitors all processes from initial contact to delivery. For safety-relevant products and medical technology, documented traceability is ensured.

EvidenceDegersheim
SN EN ISO 9001:2015
ISO 13485
AD 2000-Merkblatt W 0 (TÜV Süd)
Pressure Equipment Directive 2014/68/EU (TÜV Süd)
HPQ Deutsche Bahn AG (valid until 30.06.2026)

History

  1. 1907

    Foundation of a locksmith's shop by Albert Angehrn

  2. 1937

    Expansion of production in forging, pressing, stamping

  3. 1960

    New construction of the forging and stamping plant on Weierwiesstrasse

  4. 1973

    Enlargement with additional hall for heat treatment and toolmaking

  5. 1988

    Expansion with additional hall for raw material cutting and warehousing

  6. 2002

    Acquisition of Angehrn AG by Schwarz Warmpresswerk AG

  7. 2005

    Conversion of the drop forge

  8. 2010

    Introduction of the S5 method

  9. 2015

    ISO 13485 certification

  10. 2017

    Expansion of the machining department / toolmaking

  11. 2018

    Redesign of the office wing

Try it now

Test Amplifa Marketplace – no appointment needed.

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — sign up in minutes and start on your own.

Create your free account