Maintenance, testing, oil analysis and refilling of transformers at low, medium and high voltage levels — in service throughout Europe
Artur Hintz Trafo-Wartung GmbH
Neuhofen (DE)New on Amplifa
About Us
Artur Hintz Trafo-Wartung GmbH is a family-run maintenance company for all transformer types, headquartered in Neuhofen in the Palatinate. The company services distribution transformers of the medium voltage level as well as grid and machine transformers of the high voltage level: on-site maintenance and servicing, factory overhaul of distribution transformers, insulating oil treatment and insulating oil replacement including waste oil disposal, oil analysis according to DIN EN 60422, and electrical measurement and testing according to DIN VDE 0532. For the diagnosis of insulation damage, loss factor measurements (tan δ, 0.1 Hz) and partial discharge measurements up to 400 kV are performed on oil-filled and cast-resin transformers, bushings and cables. Another focus is the Neutrafoservice offered for around 30 years: the refilling of large transformers under vacuum according to the factory standards of European transformer manufacturers, with mobile oil treatment systems for mineral oils and ester liquids as well as vacuum pump sets up to 2,700 m³/h. In addition, work on transformers in locomotives and multiple-unit trains is offered, along with the disposal of PCB-containing and PCB-free transformer oils (up to 50 ppm LAGA). The service area is Germany and Europe, with equipped workshop vehicles and its own oil analysis and testing laboratory at the Neuhofen site.
- Site
- Neuhofen
- Processes
- On-site maintenance and servicing of transformers (oil sampling, thermography,, Factory overhaul of distribution transformers (component inspection, seal replacement, repairs,, Oil analysis (breakdown voltage, acidity, water content, DGA, PCB and furfural analysis) according, Electrical measurement and testing of transformers according to DIN VDE 0532 (insulation resistance,, Ageing diagnosis by loss factor measurement (tan δ) at 0.1 Hz and partial discharge measurement, Neutrafoservice: refilling of large transformers (oil filling under vacuum, vacuum pump sets, Insulating oil treatment and insulating oil replacement including waste oil disposal, Fault diagnosis on transformers
- Materials
- Insulating oil / mineral oil, Ester liquids, PCB-containing transformer oils (up to 50 ppm LAGA)
- Certificates
- SCC P VAZ-2021 (SCC-VAZ), WHG-certified specialist company, Transport permit under § 54 KrWG
- Founded
- 1972
- Industries
- Energy industry / power supply, Railways / rail transport (locomotives and multiple-unit trains), Industry with medium and high voltage transformers, Railways / rail transport (locomotives, multiple-unit trains), Industry with medium/high voltage transformers
- 01
On-site oil sampling (on request while energized)
- 02
Oil analysis in the laboratory according to DIN EN 60422
- 03
Electrical measurement, testing and ageing diagnosis
- 04
On-site maintenance, servicing and repair
- 05
Factory overhaul of distribution transformers
- 06
Neutrafoservice (refilling under vacuum)
- 07
Disposal of PCB-containing and PCB-free oils
Oils and Media
Insulating oil / mineral oil
Treatment, replacement and refilling under vacuum in oil-filled transformers.
Ester liquids
Processed in the mobile oil treatment systems as an alternative insulating oil.
PCB-containing transformer oils (up to 50 ppm LAGA)
Collective disposal and transport with the corresponding permits under WHG and KrWG.
Site

Neuhofen
DEMain site with testing laboratory, oil analysis laboratory and mobile fleet
- Lot size
- Individual units up to large transformers
- Materials
- Insulating oil, ester liquids, PCB-free and PCB-containing oils
- Testing laboratory according to DIN VDE 0532
- Oil analysis laboratory
- Mobile oil treatment systems (truck & trailer)
- Vacuum pump sets up to 2,700 m³/h
- Mobile high-performance vacuum systems
- Diesel power generators
Components and Operating Materials




Inside the production










Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| On-site maintenance and servicing of transformers (oil sampling, thermography,Testing | – | – | – | – | Mineral oil, Ester liquids |
| Factory overhaul of distribution transformers (component inspection, seal replacement, repairs,Assembly | – | – | – | – | Insulating oil |
| Oil analysis (breakdown voltage, acidity, water content, DGA, PCB and furfural analysis) accordingTesting | – | – | – | – | Mineral oil, PCB-containing oils (up to 50 ppm LAGA), PCB-free oils |
| Electrical measurement and testing of transformers according to DIN VDE 0532 (insulation resistance,Testing | – | – | – | – | – |
| Ageing diagnosis by loss factor measurement (tan δ) at 0.1 Hz and partial discharge measurementTesting | – | – | – | – | – |
| Neutrafoservice: refilling of large transformers (oil filling under vacuum, vacuum pump setsAssembly | – | – | – | – | Mineral oils, Ester liquids |
| Insulating oil treatment and insulating oil replacement including waste oil disposalSurface treatment | – | – | – | – | Insulating oil, Mineral oil, Ester liquids |
| Fault diagnosis on transformersTesting | – | – | – | – | – |
| Work on transformers in locomotives and multiple-unit trainsAssembly | – | – | – | – | – |
6 Anlagen & Maschinen
| Machine | Manufacturer / model | Quantity | Working area | Year built | Site |
|---|---|---|---|---|---|
| Vacuum pump set | – | – | Capacities up to 2,700 m³/h, including recording of the vacuum curve | – | Neuhofen / mobile |
| Oil treatment system (mobile on truck & trailer) | – | – | For mineral oils and ester liquids | – | mobile |
| Mobile high-performance vacuum system (active part drying) | – | – | – | – | mobile |
| Diesel power generator | – | – | Ordering including auxiliary tank | – | mobile |
| Testing laboratory (electrical testing according to DIN VDE 0532) | – | – | – | – | Neuhofen |
| Oil analysis laboratory | – | – | – | – | Neuhofen |
Additional services
Quality and Certification
The work is performed by experienced skilled personnel with equipment according to the factory standards of European transformer manufacturers. Oil analysis results are assigned to the relevant standards (including IEC 60156, IEC 62021, IEC 60567/60599, DIN EN 12766, DIN EN 61198) and evaluated according to DIN EN 60422; electrical testing is carried out according to DIN VDE 0532.
| Evidence | Neuhofen |
|---|---|
| SCC P VAZ-2021 (SCC-VAZ) | |
| WHG-certified specialist company | |
| Transport permit under § 54 KrWG |
History
- 1972
Foundation of the company; since then active throughout Europe as a transformer maintenance service provider
- 1995
Start of the Neutrafoservice (refilling of large transformers), offered for around 30 years