Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search
Eggert – Fertigung

Civil engineering and pipeline construction, horizontal drilling, network planning and ordnance clearance from Heek

Eggert Logo

Eggert GmbH

Siemensstraße 39, 48619 Heek · DENew on Amplifa

2011Founded
80Employees
HRB 12874, Amtsgericht CoesfeldCommercial Register
GmbHLegal Form

About Eggert GmbH

Eggert GmbH is a civil engineering and pipeline construction company founded in 2011 in Heek in the Münsterland region, with around 80 employees. Its area of operation covers the Münsterland, the Lower Rhine and the Ruhr region. Core services include gas, water and district heating pipeline construction, sewer construction, earthworks, cable and line construction up to 30 kV including fibre optics, as well as geothermal and well drilling. A key focus is the trenchless horizontal drilling method (flush drilling), used to lay supply lines beneath roads, railways, watercourses and buildings. The portfolio is complemented by network planning and maintenance, surveying, pressure testing, suction excavator technology, as well as ordnance detection and clearance using ground-based and airborne methods. Customers include municipal energy suppliers, municipalities, state enterprises and industrial companies. The company is certified in accordance with DVGW GW 301, GW 302 and GW 381 and is a recognised training company of the IHK Nord Westfalen.

Site
Heek
Processes
Pipeline construction (gas and water pipeline construction), District heating pipeline construction, Sewer construction (new sewer construction and rehabilitation), Wastewater pressure pipeline installation, Biogas pipeline construction, Cable laying (low-voltage, medium-voltage and fibre optic lines), Electrical work up to 30 kV, Horizontal drilling (flush drilling method / HDD, trenchless installation)
Materials
Steel, Plastic, Concrete, Composite materials, PE pipe DN 125, Stainless steel, Copper, Bentonite
Certificates
DVGW Code of Practice GW 301, DVGW Code of Practice GW 302 (GN 2), DVGW Code of Practice GW 381 (A), DVGW GW 301 (G3/W3), DVGW GW 302 (GN 2), DVGW GW 381 (A)
Founded
2011
Employees
80
Industries
Energy supply, Municipalities/state enterprises, Telecommunications/fibre optic networks, Water/wastewater management, Industry
  1. 01

    Site survey and ordnance detection (ground-penetrating radar, magnetometry)

  2. 02

    Network planning and surveying

  3. 03

    Earthworks/civil engineering or horizontal drilling (pilot bore, reaming,

  4. 04

    Pipeline, cable and sewer construction

  5. 05

    Testing (pressure tests, soil compaction) and documentation

  6. 06

    Maintenance and 24/7 emergency standby service

Materials and Processes

Stahl

Steel

Pipe material for gas, water, district heating and wastewater pressure pipelines, also in horizontal drilling.

PE

Plastic (e.g. PE pipe DN 125)

Pipe material for trenchless installation of water, gas and fibre optic routes.

Beton

Concrete

Used in sewer construction, concrete ring sinking and concrete pipelines.

Verbund

Composite materials

Pipe material for special applications in pipeline construction.

Bentonit

Bentonite

Flush fluid for stabilising the bore channel in horizontal drilling.

Alu

Aluminium (telescopic shafts)

Telescopic shafts for ordnance detection and shaft work.

Locations

Standort Heek

Heek

DE

Headquarters, operating yard and construction services

Materials
Steel, plastic, concrete, composite materials
  • Suction excavator
  • HDD machine (horizontal drilling rig)
  • Static plate load tester
  • Ground-penetrating radar survey technology (GeoRadar NRW)
  • Bladder plug devices

Services and Components

Horizontal drilling rig in operation
Horizontal drilling rig in operationHorizontal drilling · Energy supply
Shallow drilling / flush drilling method
Shallow drilling / flush drilling methodHorizontal drilling · Municipal supply

Inside the production

Pipeline construction on site
Pipeline construction on site
HDD rig handover
HDD rig handover
Network planning and maintenance
Network planning and maintenance
Ordnance clearance
Ordnance clearance
Operating yard Heek
Operating yard Heek

Industries

Energy supplyMunicipalities/state enterprisesTelecommunications/fibre optic networksWater/wastewater managementIndustry

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Pipeline construction (gas and water pipeline construction)Assembly––––Steel, Plastic, Concrete, Composite materials
District heating pipeline constructionAssembly–––––
Sewer construction (new sewer construction and rehabilitation)Assembly–––––
Wastewater pressure pipeline installationAssembly–––––
Biogas pipeline constructionAssembly–––––
Cable laying (low-voltage, medium-voltage and fibre optic lines)Assembly–––––
Electrical work up to 30 kVAssembly–––––
Horizontal drilling (flush drilling method / HDD, trenchless installation)Forming––––Pipes made of steel, plastic, concrete or composite
Geothermal and well drillingForming–––––
Earthworks / civil engineering (earthwork operations, excavation pit construction)Engineering–––––
Ordnance clearance (detection and recovery of ordnance)Testing–––––
Ordnance detection (surface, depth and borehole probing, ground-based and airborne)Testing–––––
Network planning and maintenance (line planning, detection, exploration, surveying andEngineering–––––
Site survey and expert reportsEngineering–––––
Gas and water house connections (construction, repair and rehabilitation)Assembly–––––
Supply lines (modernisation and maintenance)Assembly–––––
Sealing of gas pipelines with bladder plug devices, pressure testsTesting–––––
Suction excavator technology / soil suction excavationEngineering–––––
Road construction trade (road and pavement excavations, surface restoration)Engineering–––––
Plumbing and heating construction (gas and water installation trade)Assembly–––––
Well construction tradeEngineering–––––
Construction of building penetrationsEngineering–––––
Pressing of sheet pile boxes, sinking of concrete rings, use of aluminium telescopic shaftsEngineering–––––
Low-vibration drilling, inclined drillingForming–––––

5 Anlagen & Maschinen

MachineManufacturer / modelQuantityWorking areaYear builtSite
Suction excavator––––Heek
HDD machine (horizontal drilling rig)––––Heek
Static plate load tester (device for in-house soil compaction monitoring)––––Heek
Ground-penetrating radar survey technology (GeoRadar NRW)––––Heek
Bladder plug devices (for sealing gas pipelines)––––Heek

Additional services

Pipeline construction (gas, water, district heating)Sewer construction (new construction and rehabilitation)Civil engineering/earthworksNetwork planning and maintenanceHorizontal drilling (trenchless installation)Ordnance clearance/detectionCable and line construction (up to 30 kV, fibre optics)Geothermal and well drillingSuction excavator technology24/7 emergency standby servicePressure testsSurveying and documentationBiogas pipeline construction

Reference customers

Stadtwerke Wernemunicipal energy suppliersMunicipalitiesState enterprises

Quality and Certification

Eggert GmbH is certified in accordance with DVGW codes of practice GW 301 (G3/W3), GW 302 (GN 2) and GW 381 (A). In-house monitoring includes, among other things, soil compaction testing with a static plate load tester as well as complete documentation, surveying and pressure tests.

EvidenceHeek
DVGW GW 301 (G3/W3)
DVGW GW 302 (GN 2)
DVGW GW 381 (A)

History

  1. 2011

    Founding of Eggert GmbH in January 2011 in Heek; entry in the trades register for plumbing/heating construction and road construction on 15.02.2011, and for electrical engineering on 31.05.2011.

  2. 2021

    Initial certification in accordance with DVGW GW 381 (A) on 15.03.2021; recognised training company of the IHK Nord Westfalen.

Try it now

Test Amplifa Marketplace – no appointment needed.

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — sign up in minutes and start on your own.

Create your free account