Engineering und technische Betriebsführung für Infrastruktur, Anlagenbau sowie Energie- und Umwelttechnik

INPUT Ingenieure GmbH
Sehnde (DE) · Dong Hoi (VN) · Cordoba (AR)New on Amplifa
About INPUT Ingenieure
INPUT Ingenieure GmbH was founded in 2000 as a planning association by partners with many years of experience in infrastructure, industrial plant construction, and energy and environmental technology, and has been operating as a GmbH since 2006. With around 20 employees in civil engineering, underground construction, mechanical engineering, and process engineering, the company realizes projects in all performance phases of the HOAI – from project development and planning to project management and construction execution for individual trades and large-scale environmental technology projects as a General Planner. Larger projects are handled turnkey as a General Contractor through the sister company INPUT Engineering GmbH, primarily in international plant construction for biogas technology. Since 2007, the company has also undertaken the technical operational management of complex process plants, including risk assessments, explosion protection documentation, incident control concepts, and inspection coordination. Its service portfolio also includes consulting, project studies, and expert opinions, the development of innovative technologies, and support in contractual and financing matters. Headquarters are in Sehnde near Hanover; outposts of INPUT Engineering are located in Dong Hoi (Vietnam) and Cordoba (Argentina).
- Site
- Sehnde
- Processes
- Project development, planning and realization of technical projects (infrastructure, building, Engineering as General Planner for 'turn key' concepts and individual trades, Plant construction / Biogas technology as General Contractor (turn-key), Technical operational management of complex process plants, Consulting, project studies and expert opinions, Project management, project steering and project development, Development and realization of innovative technologies (R&D), Planning and construction execution of individual trades as well as environmental technology large
- Materials
- Engineering according to HOAI, General Contractor (Turn-key), Technical Operational Management, Research and Development
- Founded
- 2000
- Employees
- ca. 20
- Industries
- Infrastructure, Building Construction, Energy and Environmental Technology, Plant Construction, Biogas Technology
- 01
Project study and consulting
- 02
Project development and planning (HOAI)
- 03
Project management and project steering
- 04
Turn-key plant construction as general contractor
- 05
Technical operational management and plant operation
Services and Processes
Engineering according to HOAI
Planning and realization of technical projects in all phases of the HOAI as a general planner or as an individual trade specialist
General Contractor (Turn-key)
Turn-key handling of large plant projects, primarily biogas technology, via INPUT Engineering GmbH
Technical Operational Management
Operational management of process plants including safety, legal inspections, and plant optimization
Research and Development
Development and realization of innovative technologies in collaboration with industry and research.
Locations
Sehnde
DEHeadquarters, Planning and Project Management
Dong Hoi
VNINPUT Engineering GmbH outpost (Asia), Biogas technology plant construction
Cordoba
ARINPUT Engineering GmbH outpost (South America), Biogas technology plant construction
Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Project development, planning and realization of technical projects (infrastructure, buildingEngineering | – | – | – | – | – |
| Engineering as General Planner for 'turn key' concepts and individual tradesEngineering | – | – | – | – | – |
| Plant construction / Biogas technology as General Contractor (turn-key)Engineering | – | – | – | – | – |
| Technical operational management of complex process plantsEngineering | – | – | – | – | – |
| Consulting, project studies and expert opinionsEngineering | – | – | – | – | – |
| Project management, project steering and project developmentEngineering | – | – | – | – | – |
| Development and realization of innovative technologies (R&D)Engineering | – | – | – | – | – |
| Planning and construction execution of individual trades as well as environmental technology largeEngineering | – | – | – | – | – |
| Operational management of biogas plants including risk assessment, explosion protectionTesting | – | – | – | – | – |
8 Anlagen & Maschinen
| Machine | Manufacturer / model | Quantity | Working area | Year built | Site |
|---|---|---|---|---|---|
| Fermenter (PlugFlow) Type Strabag TF 2.800 | Strabag TF 2.800 | – | – | – | Bioenergie Dargun GmbH |
| Fermenter (PlugFlow) Type INPUT PFR 2.500 / 3.200 / 1.500 | INPUT PFR 1.500–3.200 | – | – | – | verschiedene Biogasanlagen (Glentorf, Loop, Harber, Giesen, Kaltenweide, Peine, |
| Gas preparation water wash | Malmberg | 1 | 1.200 Nm³/h | – | Bioenergie Dargun GmbH |
| Gas preparation organic-physical wash | Schwelm | 1 | 400 Nm³/h | – | Biogas Glentorf GmbH |
| Gas preparation physical absorption | Haase | 1 | 550 Nm³/h | – | Bioenergie Loop GmbH |
| Gas preparation pressure swing adsorption | Carbotech | 1 | 400 Nm³/h | – | Bioenergie Giesen GmbH |
| BHKW | Deutz 800 kW el.; 716 kW el.; 600 kW el. | – | – | – | Harber, Kaltenweide, Hoheneggelsen |
| BHKW | Jenbacher 852 kW el.; 880 kW el. | – | – | – | Kaltenweide, Peine |
Additional services
Reference customers
History
- 2000
Foundational establishment as a planning association by partners with many years of experience in infrastructure, industrial plant construction, and energy and environmental technology
- 2006
Entry into operational activity as a GmbH
- 2007
Commencement of operational management for energy technology plants
- 2008
Operational management Kaltenweide (until 2015) and Hoheneggelsen (until 2013)
- 2011
Operational management Harber (until 2016) and Giesen
- 2012
Operational management Peine
- 2013
Operational management Biogas Glentorf (since 2013) and Bioenergie Loop (2013–2016)
- 2015
Assumption and handover of Bioenergie Dargun to the new owner