
Planning, construction and commissioning of industrial automation technology, special machinery and control cabinets from Baindt.
Mack Automation GmbH
88255 Baindt (Baden-Württemberg)New on Amplifa
About Mack Automation
Mack Automation GmbH is a family-owned, medium-sized company based in Baindt in Baden-Württemberg, specializing in industrial automation technology since 1974. The company executes projects along the entire value chain: from hardware design and schematic diagram creation to software development with PLC and robot programming, through to industrial assembly, plant commissioning and service and maintenance. Its portfolio includes automation technology, special machinery construction including joining, dispensing and testing technology, as well as control cabinet construction with cabinets, control desks and special enclosures. Software development is carried out, among others, with Siemens S7/TIA Portal, Beckhoff TwinCAT and Allen-Bradley. Customers come from the automotive industry and its supply sectors, mechanical engineering, the pharmaceutical and food industries, the chemical industry, HVAC and refrigeration technology, the healthcare sector, and parking systems. The company is part of the family-run Mack Group and delivers projects in Germany and internationally on five continents.
- Site
- Baindt
- Processes
- Automation technology (planning, construction and commissioning of industrial automation technology), Special machinery construction (design, manufacturing, commissioning of special machinery), Welding (as part of special machinery construction), Joining and cutting operations (special machinery construction), Dispensing, Potting, Marking, Robotics handling / handling systems
- Materials
- PLC Programming, Schematic Diagram Creation
- Certificates
- DIN EN ISO 9001, ISO 9001
- Founded
- 1974
- Employees
- > 30
- Industries
- Automotive industry and suppliers, Mechanical engineering, Pharmaceutical industry, Food industry, Chemical industry, HVAC and refrigeration technology
- 01
Project engineering and hardware design
- 02
Schematic diagram creation and electrical engineering design
- 03
Software development and robot programming
- 04
Control cabinet construction
- 05
Industrial assembly and electrical installation
- 06
Plant commissioning
- 07
Service and maintenance
Processes and Technology
PLC Programming
Control software with Siemens S7/TIA Portal, Beckhoff TwinCAT and Allen-Bradley for plant control and visualization.
Schematic Diagram Creation
Hardware design and schematic diagram creation with EPLAN and RUPLAN according to DIN EN 81346.
Locations

Baindt
DEHeadquarters, production and administration
- ModCenter control cabinet module machining center (Steinhauer)
Services and Systems



Inside the production




Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Automation technology (planning, construction and commissioning of industrial automation technology)Engineering | – | – | – | – | – |
| Special machinery construction (design, manufacturing, commissioning of special machinery)Engineering | – | – | – | – | – |
| Welding (as part of special machinery construction)Joining | – | – | – | – | – |
| Joining and cutting operations (special machinery construction)Joining | – | – | – | – | – |
| DispensingJoining | – | – | – | – | – |
| PottingJoining | – | – | – | – | – |
| MarkingSurface | – | – | – | – | – |
| Robotics handling / handling systemsAssembly | – | – | – | – | – |
| Measuring and testing (test stations)Testing | – | – | – | – | – |
| Machine visionTesting | – | – | – | – | – |
| Assembly systems and manual workstationsAssembly | – | – | – | – | – |
| Singulation and feeding of partsAssembly | – | – | – | – | – |
| Control cabinet construction (control cabinets, incoming feed cabinets, control cabinets, controlAssembly | – | – | – | – | – |
| Robot programming (welding robots, handling robots)Engineering | – | – | – | – | – |
| Plant commissioning (virtual commissioning, cold/warm commissioning, cycle time optimization)Engineering | – | – | – | – | – |
| Commissioning of process engineering systemsEngineering | – | – | – | – | – |
| Commissioning of production systemsEngineering | – | – | – | – | – |
| Commissioning of welding linesEngineering | – | – | – | – | – |
| Electrical installation incl. cable route construction, cable routing/connectionAssembly | – | – | – | – | – |
| Industrial assembly / machine installationAssembly | – | – | – | – | – |
| PLC programming (Siemens S7/TIA Portal, Beckhoff TwinCAT 2/3, Allen-Bradley ControlLogix; LAD,Engineering | – | – | – | – | – |
| Drive technology (Siemens, SEW, AllenBradley)Engineering | – | – | – | – | – |
| Schematic diagram creation (Eplan, Ruplan, DIN EN 81346, DIN EN 61355)Engineering | – | – | – | – | – |
| Electrical engineering designEngineering | – | – | – | – | – |
| Retrofit (modernization of existing systems)Engineering | – | – | – | – | – |
| Plant expansionsEngineering | – | – | – | – | – |
| Plant relocation (dismantling, transport, reassembly)Assembly | – | – | – | – | – |
1 Anlagen & Maschinen
| Machine | Manufacturer / model | Quantity | Working area | Year built | Site |
|---|---|---|---|---|---|
| Control cabinet module machining center | Steinhauer ModCenter | – | – | – | Baindt |
Additional services
Quality
The functionality of systems is verified in-house prior to commissioning using simulations and virtual commissioning; all tests are documented in accordance with statutory and customer-specific requirements. The company has been certified to DIN EN ISO 9001 since 1998.
| Evidence | Baindt |
|---|---|
| ISO 9001 |
History
- 1974
Foundation of Elektro-Mack GmbH in Baindt by Karl Mack
- 1978
Construction of a new building complex on Kiesgrubenstraße
- 1981
Expansion of the electrical workshop
- 1987
Construction of an additional office and administration building
- 1998
Initial certification to ISO 9001
- 2000
New construction of production hall II
- 2006
Foundation of Mack Holding GmbH by Karl Mack
- 2013
New construction of production hall III
- 2018
First participation in the Ravensburg Education Fair
- 2019
Integration of the special machinery construction business unit
- 2020
Delivery of the first fully automatic production line for expansion material elements as well as systems for mask production; Wolfgang Keßler appointed to management
- 2021
Renaming to Mack Automation GmbH
- 2024
50th company anniversary; founder Karl Mack retires from management