
Pipeline construction, civil engineering, asphalt construction, trenchless installation and demolition from Thannhausen

Mutzl Bau Gruppe Süd GmbH
ThannhausenNew on Amplifa
About Mutzl Bau Gruppe Süd
Mutzl Bau Gruppe Süd GmbH (until 2026 Mutzl Rohrleitungsbau GmbH) is a construction company headquartered in Thannhausen (Bavaria). Its focus is on pipeline construction, including consulting, planning and standard-compliant installation of supply and disposal lines as well as pressure and leak testing. In addition, the company carries out civil engineering work such as outdoor facilities, earthworks, sewer and pipeline construction as well as asphalt construction. Another pillar is trenchless installation technology with soil rammers in sizes 45, 75, 95 and 130. Complementary services include demolition work (building and industrial demolition, selective dismantling), rental of construction machinery and commercial vehicles, logistics services and project development. The small enterprise employs 9 staff and serves commercial and public clients from the region.
- Site
- Thannhausen
- Processes
- Pipeline construction (installation of supply and disposal lines), Trenchless installation technology (soil rammers 45, 75, 95 and 130), Civil engineering work (outdoor facilities, earthworks, sewer and pipeline construction), Asphalt construction, Demolition work (building and industrial demolition, selective dismantling), Excavator work, Pressure and leak testing (pipelines), Pipeline construction
- Materials
- Asphalt
- Founded
- 2019
- Employees
- 9
- Industries
- Construction industry / Civil engineering, Pipeline construction
- 01
Consulting and planning
- 02
Earthworks and groundworks
- 03
Installation of pipelines (open or trenchless)
- 04
Asphalt work
- 05
Pressure and leak testing
- 06
Dismantling and disposal
Materials & Processes
Asphalt
Used in asphalt construction for road, path and surface pavements in civil engineering.
Locations
Thannhausen
DEHeadquarters
- Soil rammers 45
- Soil rammers 75
- Soil rammers 95
- Soil rammers 130
- Excavators
- Sweepers
- Low loaders
Service Areas




Inside the production


Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Pipeline construction (installation of supply and disposal lines)Assembly | – | – | – | – | – |
| Trenchless installation technology (soil rammers 45, 75, 95 and 130)Forming | – | – | – | – | – |
| Civil engineering work (outdoor facilities, earthworks, sewer and pipeline construction)Engineering | – | – | – | – | – |
| Asphalt constructionEngineering | – | – | – | – | Asphalt |
| Demolition work (building and industrial demolition, selective dismantling)Engineering | – | – | – | – | – |
| Excavator workEngineering | – | – | – | – | – |
| Pressure and leak testing (pipelines)Testing | – | – | – | – | – |
Additional services
History
- 2019
Foundation of Mutzl Rohrleitungsbau GmbH (articles of association 12.04.2019, registration 17.04.2019, share capital 25.000 €, registered office in Krumbach); Managing Director Wilhelm Mutzl
- 2020
Relocation of registered office to Thannhausen (08.07.2020)
- 2026
Name change to Mutzl Bau Gruppe Süd GmbH as well as amendment of articles and purpose (23.03.2026)