Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search

Development, manufacturing, installation and service of onshore wind turbines in the 4 to 7 MW class

Nordex Logo

Nordex SE

Hamburg · Rostock · Oberhausen · Barásoain (Navarra)New on Amplifa

1985Founded in Give, Denmark
10,900Employees worldwide
4 sitesHamburg, Rostock, Oberhausen, Barásoain (ES)
4–7 MWFocus turbine class (Delta4000)
SELegal form, listed (TecDAX/MDAX, ISIN DE000A0D6554)

About Nordex SE

Nordex SE is a listed manufacturer of onshore wind turbines with more than 10,900 employees worldwide. The company develops, manufactures and installs wind turbines and supports them throughout their entire lifecycle with maintenance, repair and upgrades. Nacelles, rotor blades and concrete towers are manufactured at production facilities in Germany, Spain, Brazil, the USA and India. The material base comprises steel for tower and turbine components, concrete for precast towers, and composite materials for rotor blades. The product portfolio focuses on the Delta4000 platform with turbines in the 4 to 7 MW class; in addition, the Delta platform (3 MW class) continues to be manufactured. In some markets, the Nordex Group also acts as a wind farm project developer and implements turnkey projects. A global service network with around 380 service points in about 30 countries ensures the operation of the turbines. The headquarters with the Executive Board and central corporate functions is in Hamburg; the legal registered office is in Rostock. By the end of 2023, the company had installed around 50 GW of wind power capacity in more than 40 countries worldwide.

Site
Hamburg
Processes
Manufacturing of wind turbines (nacelles, rotor blades, concrete towers), Wind turbine manufacturing (series production of the 4–7 MW class, Delta4000 platform), Maintenance and repair of wind turbines (including replacement of major components such as, Installation and erection of wind turbines (turnkey projects), Development and engineering of wind turbines (turbulence development, lifecycle assessment in, Concrete tower manufacturing for wind turbines, Service/repair services, spare parts management, upgrades (Xtended Power, Xtended Lifetime), Development, manufacturing and installation of onshore wind turbines
Materials
Concrete (for wind turbine towers), Composite materials (rotor blades), Steel (tower and turbine components, derived), Steel, Concrete, Composite materials
Certificates
Lifecycle assessment in accordance with ISO 14040/14044, Global service standards
Founded
1985
Employees
10,900
Industries
Wind energy, Renewable energies
  1. 01

    Engineering and turbine development

  2. 02

    Manufacturing of nacelles

  3. 03

    Rotor blade manufacturing (composite materials)

  4. 04

    Concrete tower manufacturing

  5. 05

    Assembly and installation (turnkey)

  6. 06

    Service, maintenance and upgrades

Materials and Processes

St

Steel

Material for tower and turbine components of the wind turbines.

BT

Concrete

Material for the concrete towers manufactured by Nordex.

VW

Composite materials

Material basis of the rotor blades; recycling and fully recyclable rotor blades are a development goal.

Sites

Hamburg

DE

Headquarters (Executive Board, central corporate functions)

  • Central corporate functions

Rostock

DE

Legal registered office, main production site

  • Wind turbine production facilities

Oberhausen

DE

Site in Germany

Barásoain (Navarra)

ES

Nordex Energy Spain S.A.U., production site

  • Wind turbine production facilities

Industries

Wind energyRenewable energies

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Manufacturing of wind turbines (nacelles, rotor blades, concrete towers)Assembly––––Steel, Concrete, Composite materials (rotor blades)
Wind turbine manufacturing (series production of the 4–7 MW class, Delta4000 platform)Assembly–––––
Maintenance and repair of wind turbines (including replacement of major components such asTesting–––––
Installation and erection of wind turbines (turnkey projects)Assembly–––––
Development and engineering of wind turbines (turbulence development, lifecycle assessment inEngineering–––––
Concrete tower manufacturing for wind turbinesAssembly––––Concrete
Service/repair services, spare parts management, upgrades (Xtended Power, Xtended Lifetime)Surface–––––

1 Anlagen & Maschinen

MachineManufacturer / modelQuantityWorking areaYear builtSite
Wind turbine production facilities (nacelles, rotor blades, concrete towers)Nordex Group–––Germany, Spain, Brazil, USA, India

Additional services

Development, manufacturing and installation of onshore wind turbinesService and maintenance (approx. 380 service points in approx. 30 countries)Wind farm project developmentTurnkey projectsSpare parts managementRemote & field supportDigital services (IIoT, condition monitoring, Predict to Prevent)Upgrades/modernisation (Xtended Power, Xtended Lifetime)Technical trainingRepoweringLobbying/association work (WindEurope, GWEC, GWO, ACP)

Quality

The service teams are qualified according to global standards; lifecycle assessments of the products are carried out in accordance with ISO 14040 and ISO 14044. Digital methods such as condition monitoring and the predictive maintenance programme "Predict to Prevent" are used for early damage detection.

EvidenceHamburgRostockOberhausenBarásoain (Navarra)
Lifecycle assessment in accordance with ISO 14040/14044
Global service standards

History

  1. 1985

    Founded in Give, Denmark (from Brande Kedel og Beholderfabrik); first wind turbine

  2. 1991

    Start of Nordex activities in Germany (Nordex Energieanlagen GmbH)

  3. 1995

    First series-produced megawatt-class wind turbine (world's first 1 MW turbine in series production)

  4. 1996

    Balcke-Dürr (Babcock-Borsig) acquires 51% of Nordex

  5. 1999

    Acquisition of the former diesel engine plant in Rostock as main plant

  6. 2001

    IPO (Neuer Markt), integration of Südwind Babcock-Borsig

  7. 2003–2005

    Crisis and restructuring; closure of the Give plant

  8. 2006

    First German offshore turbine in Breitling; Chinese manufacturing for large turbines

  9. 2010

    Opening of the Jonesboro, Arkansas (USA) plant; renamed Nordex SE

  10. 2011

    Relocation of the company's headquarters to Hamburg-Langenhorn

  11. 2016

    Merger with Acciona Windpower to form the Nordex Group; Acciona S.A. becomes main shareholder (approx. 47%)

  12. 2017

    Market launch of the N149/4.0-4.5, the first turbine of the 4 MW+ class; José Luis Blanco becomes CEO

  13. 2023

    Approx. 50 GW of installed wind power capacity worldwide in more than 40 countries (by the end of 2023)

Try it now

Test Amplifa Marketplace – no appointment needed.

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — sign up in minutes and start on your own.

Create your free account