Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search

Connection technology, Slim-Floor, and Composite constructions for reinforced concrete, prefabricated, and composite construction

Peikko Logo

Peikko Austria GmbH

6837 Weiler · 1220 WienNew on Amplifa

1965Founded (Peikko Group, Lahti)
ca. 2.200Employees (Peikko Group worldwide)
261 Mio. €Revenue 2025 (Peikko Group)
13Production facilities worldwide
33Subsidiaries in 33 countries

About Peikko Austria

Peikko Austria GmbH is the Austrian subsidiary of Peikko Group Corporation, a family-owned business founded in Lahti, Finland in 1965, with approximately 2,200 employees and a revenue of 261 million Euros (2025). Peikko develops and manufactures connection technology for concrete prefabricated components and cast-in-place concrete, slim-floor composite girders (DELTABEAM®), composite columns (ATLANT®), tie rod systems (BESISTA®), and floor systems. Products are manufactured in its own certified production facilities in 13 countries and are largely standardized and kept in stock. Additionally, Peikko offers engineering services such as comparative calculations, load, vibration, and system analyses, as well as the free design software Peikko Designer®. Customers include prefabricated component factories, construction companies, property owners, investors, architects, and structural engineers, among others, across data center, industrial, office, residential, and infrastructure construction. In Austria, Peikko is represented by its headquarters in Weiler (Vorarlberg) and an office in Vienna; the group delivers globally to over 30 countries.

Site
Weiler
Processes
Connection technology for concrete prefabricated components (bolt connections, column and beam, Reinforcement technology for cast-in-place concrete (bolt coupling system, shear and longitudinal, DELTABEAM® Slim-Floor Composite Girder (fire resistance up to R120 without additional measures), DELTABEAM® Truss Truss Girders (spans up to 16 m), ATLANT® / ATLANT® Strong Composite Columns (steel core columns, fire resistance R120), BESISTA® Tie Rod and Compression Rod Systems (tie rods up to 15 m long, hot-dip galvanized), Floor systems (gap profiles, TERADOWEL load transfer systems for expansion joints in concrete, Planning and design (Peikko Designer® design software, engineering, project support)
Materials
Steel, Concrete / Reinforced Concrete, Wood (Hybrid construction), Bolt Connections for Column Connections, Slim-Floor Composite Construction, Hot-Dip Galvanization
Certificates
ISO 9001:2015, ISO 14001:2015, ISO 45001:2018, ISO 19443:2018, ISO 3834-2, EN 1090, ISO 9001, ISO 14001, ISO 45001, ISO 19443
Founded
1965 (Peik
Employees
around 2.200 (Peikko
Industries
Data Centers, Office and commercial buildings, Residential construction, Industrial construction, Warehousing & Logistics, Energy supply
  1. 01

    Development and Engineering

  2. 02

    Production in own facilities

  3. 03

    Inventory of standardized products

  4. 04

    Planning and design (Peikko Designer®)

  5. 05

    Sales and technical consultation

  6. 06

    Project support until execution

Materials and Processes

S

Steel

Basic material for connection technology, composite girders, anchor plates, and tie rod systems.

B

Concrete / Reinforced Concrete

Application material for anchors, reinforcement technology, and floor systems.

H

Wood (Hybrid construction)

Combinable with steel and concrete in hybrid structures with ROOCO®/TICCO® connections.

SG

Bolt Connections for Column Connections

Weld-free, fast-assembly connections with defined load-bearing capacities.

SF

Slim-Floor Composite Construction

DELTABEAM® girders with fire resistance up to R120 without additional measures.

FV

Hot-Dip Galvanization

Corrosion protection for BESISTA® system elements including threaded rods.

Locations

Weiler

AT

Headquarters and Sales Office Austria

Wien

AT

Vienna Office

Industries

Data CentersOffice and commercial buildingsResidential constructionIndustrial constructionWarehousing & LogisticsEnergy supplyPower plant constructionWind powerInfrastructureSports facilitiesHealthcareEducation & CultureHotelsParking garagesEnergy supply (including core energy sector)Machine buildersProperty owners/Investors/Project developers

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Connection technology for concrete prefabricated components (bolt connections, column and beamJoining––––Steel, Reinforced Concrete, Concrete
Reinforcement technology for cast-in-place concrete (bolt coupling system, shear and longitudinalJoining––––Steel, Concrete
DELTABEAM® Slim-Floor Composite Girder (fire resistance up to R120 without additional measures)Installation––––Steel, Concrete
DELTABEAM® Truss Truss Girders (spans up to 16 m)Installation–16 m––Steel
ATLANT® / ATLANT® Strong Composite Columns (steel core columns, fire resistance R120)Installation––––Steel, Concrete
BESISTA® Tie Rod and Compression Rod Systems (tie rods up to 15 m long, hot-dip galvanized)Installation–15 m––Steel
Floor systems (gap profiles, TERADOWEL load transfer systems for expansion joints in concreteJoining––––Steel, Concrete
Planning and design (Peikko Designer® design software, engineering, project support)Engineering–––––

Additional services

Planning and design (Peikko Designer®)Engineering (Comparative calculations, load, vibration, and system analyses)Project support from concept phase to executionTechnical consultationEvents and webinarsInventory of standardized products in 13 production facilities

Reference customers

Google Data Center Saint-GhislainDATA4 Data Center WarschauLegero United CampusKiefel PackagingArbeiter-Samariter-Bund WienRudolf Steiner Schule WienAudi GVZTaunusTurmRicola KräuterzentrumBorussia-Park StadiumData Center Marseille

Quality and Certification

Peikko manufactures in its own production facilities certified according to ISO 9001, ISO 14001, and ISO 45001; the main production facilities are certified according to ISO 3834-2 and EN 1090. For the core energy sector, the relevant supply chain is certified according to ISO 19443, and many products have construction approvals, ETA tests, and CE marking.

EvidenceWeiler
ISO 9001
ISO 14001
ISO 45001
ISO 19443
ISO 3834-2
EN 1090

History

  1. 1965

    Foundation of Peikko in Lahti, Finland

  2. 1991

    Introduction of the HPKM® column base – benchmark for bolt connections for columns

Try it now

Test Amplifa Marketplace – no appointment needed.

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — sign up in minutes and start on your own.

Create your free account