Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search
REO – Fertigung

A cooperative district heating supplier operating biomass heating plants in East Tyrol, supplying households and small businesses with regional hackwood district heating.

REO Logo

Regionalenergie Osttirol reg. Gen.m.b.H.

Tristach (Main) · Heating plants and wood storage in 16 municipalities of East TyrolNew on Amplifa

1996Founded
18Heating plants in operation (as of 2026)
ca. 18,000 kWTotal capacity of all heating plants
2026New heating plant Obertilliach (3,000 kW)

About Regionalenergie Osttirol

Regionalenergie Osttirol reg. Gen.m.b.H. (REO) is a limited liability registered cooperative founded in 1996 and headquartered in Tristach near Lienz. The company operates a network of 18 biomass heating plants with a total capacity of approximately 18,000 kW, where hackwood from regional forestry is burned. The boiler technology comes from manufacturers such as Mawera, Urbas, Agro Forst, Köb, Fröhling, Heizomat, and Kohlbach. REO supplies households and small businesses in the municipalities of the East Tyrol district with district and local heating at fair, indexed prices. Additionally, the company maintains wood and hackwood storage facilities for members to purchase energy wood, offers heat and cold tariffs, e-car-sharing (FLUGS), electricity (REO Strom), as well as a maintenance and emergency service with its own plant technicians. The cooperative approach ensures short supply routes and regional value creation.

Site
Tristach, Austria
Processes
District and local heating supply with regional biomass (hackwood), Wood and hackwood purchase from members (wood storage facilities), Heat and cold tariffs for consumers and small businesses, FLUGS e-car-sharing, REO Strom, Heating maintenance and emergency service
Materials
Forest Hackwood, Mawera Biomass Boiler, Urbas Biomass Boiler, Agro Forst Biomass Boiler, Köb/KÖB Biomass Boiler, Fröhling Biomass Boiler, Heizomat Biomass Boiler, Kohlbach Biomass Boiler
Certificates
In-house Plant Technicians in the Field, Heating Maintenance and Emergency Service
Founded
1996
Industries
Energy supply, District heating, Households, Small businesses
  1. 01

    Wood and hackwood purchase from members

  2. 02

    Storage in wood and hackwood storage facilities

  3. 03

    Provision as fuel for heating plants

  4. 04

    Combustion in biomass boilers

  5. 05

    Distribution through district and local heating networks

  6. 06

    Heat transfer to households and small businesses

Fuels and Plant Technology

Hackgut

Forest Hackwood

Regional fuel from the East Tyrolean forestry industry, purchased by cooperative members and supplied from company storage facilities.

Mawera

Mawera Biomass Boiler

Hackwood boilers at eight locations ranging from 110 kW (Tristach) to 3,000 kW (Matrei, Obertilliach).

Urbas

Urbas Biomass Boiler

4,000-kW boiler of the Biomass Processing and Heating Cooperative Sillian-Hochpustertal, operational since 2000.

Agro Forst

Agro Forst Biomass Boiler

Boilers in Abfaltersbach (1,500 kW) and Außervillgraten (500 kW); a new boiler delivered to Abfaltersbach in 2026.

Köb

Köb/KÖB Biomass Boiler

Boilers in Nikolsdorf and Oberlienz with 220 kW each in capacity.

Fröhling

Fröhling Biomass Boiler

Boilers in Kals Oberlohr, Oberlienz Schneeberger Feld and Strassen Gemeindegarten with 110 kW each.

Heizomat

Heizomat Biomass Boiler

Boilers in Schloss Lengberg (150 kW) and Innervillgraten (200 kW).

Kohlbach

Kohlbach Biomass Boiler

600-kW boiler of the LLA heating plant, the cooperative's first heating plant from 1996.

Heating Plants and Systems

Matrei Heating Plant
Matrei Heating PlantBiomass boiler (Mawera, 3,000 kW) · District heating supply
Tristach Heating Plant
Tristach Heating PlantBiomass boiler (Mawera, 110 kW) · District heating supply
Overview Map of Heating Plants and Wood Storage
Overview Map of Heating Plants and Wood StorageNetwork overview · Site planning

Inside the production

Regional. Ecological. Flexible. – Forest and wood as energy sources
Regional. Ecological. Flexible. – Forest and wood as energy sources
Heating supply for households and small businesses in East Tyrol
Heating supply for households and small businesses in East Tyrol
FLUGS e-car-sharing of Regionalenergie Osttirol
FLUGS e-car-sharing of Regionalenergie Osttirol
REO 30 Years Seal (2026)
REO 30 Years Seal (2026)

Industries

Energy supplyDistrict heatingHouseholdsSmall businesses

7 Anlagen & Maschinen

MachineManufacturer / modelQuantityWorking areaYear builtSite
Biomass Boiler (Hackwood Boiler)Mawera–––Tristach, Matrei, Virgen, Kals Ködnitz, Gaimberg, Heinfels, Obertilliach
Biomass BoilerAgro Forst––2008/2010Abfaltersbach, Außervillgraten
Biomass BoilerUrbas1–2000Sillian
Biomass BoilerKöb/KÖB2–1998/1999Nikolsdorf, Oberlienz
Biomass BoilerFröhling3–2000/2012Kals Oberlohr, Oberlienz Schneeberger Feld, Strassen Gemeindegarten
Biomass BoilerHeizomat2–2009/2012Schloss Lengberg, Innervillgraten
Biomass BoilerKohlbach1–1996LLA Heating Plant

Additional services

District and local heating supply with regional biomass (hackwood)Wood and hackwood purchase from members (wood storage facilities)Heat and cold tariffs for consumers and small businessesFLUGS e-car-sharingREO StromHeating maintenance and emergency service

Quality and Supply Security

The plants are operated and maintained by our own plant technicians in the field, including servicing and maintenance of the heating plants. A heating maintenance and emergency service ensures permanent supply for heat customers.

EvidenceTristach
In-house Plant Technicians in the Field
Heating Maintenance and Emergency Service

History

  1. 1996

    Foundings of the cooperative; commissioning of the LLA heating plant (600 kW, Kohlbach) – start of district heating supply.

  2. 1998

    Commissioning of the Oberlienz heating plant (220 kW, KÖB).

  3. 1999

    Commissioning of the Kals Ködnitz heating plants (440 kW, Mawera) and Nikolsdorf (220 kW, Köb).

  4. 2000

    Commissioning of the Kals Oberlohr (110 kW, Fröhling) and Sillian-Hochpustertal (4,000 kW, Urbas) heating plants.

  5. 2003

    Commissioning of the Heinfels (220 kW, Mawera) and Virgen (700 kW, Mawera) heating plants.

  6. 2004

    Commissioning of the Matrei heating plant (3,000 kW, Mawera).

  7. 2005

    Commissioning of the Gaimberg heating plant (350 kW, Mawera).

  8. 2008

    Commissioning of the Abfaltersbach heating plant (1,500 kW, Agro Forst).

  9. 2009

    Commissioning of the Tristach (110 kW, Mawera) and Schloss Lengberg (150 kW, Heizomat) heating plants.

  10. 2010

    Commissioning of the Außervillgraten heating plant (500 kW, Agro Forst).

  11. 2012

    Commissioning of the Oberlienz Schneeberger Feld (110 kW, Fröhling) and Innervillgraten (200 kW, Heizomat) heating plants.

  12. 2016

    Commissioning of the Strassen Gemeindegarten (110 kW, Fröhling) heating plant.

  13. 2026

    30th Anniversary; commissioning of the new Obertilliach heating plant (3,000 kW, Mawera) including bulk storage hall and buffer tank; network extensions in Abfaltersbach and Kals am Großglockner.

Try it now

Test Amplifa Marketplace – no appointment needed.

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — sign up in minutes and start on your own.

Create your free account