Piping construction, steel construction and industrial assembly for chemical, petrochemical and energy and environmental technology

Schwarz & Schmidhofer Industrieanlagenbau GmbH
Frankenthal (Pfalz)New on Amplifa
About Schwarz & Schmidhofer Industrial Plant Construction
Schwarz & Schmidhofer Industrieanlagenbau GmbH has been active in piping construction, steel construction, and industrial assembly since 1987, and is based in Frankenthal (Pfalz). The range of services extends from the planning and prefabrication of pipe parts (spools) to welding (WIG, MIG, MAG, E-Hand, WIG-Orbital), plant assembly, commissioning assistance, corrosion protection, and insulation. The company manufactures pipe parts, pipe bends, and welded steel components such as pipe bridges, support structures, pipe hangers, operator platforms, ladders, and railings in its own operation. High- and alloy steels (notably 16Mo3, 13CrMo 4-5, P91, P92), stainless steels (1.4301 to 1.4591, Duplex 1.4662), nickel alloys (Alloy 201, 400, 800), titanium, and plastics are processed. Customers primarily come from chemical, petrochemical, energy and environmental technology, power plant and CHP construction, and the wood industry. The company is certified according to ISO 9001:2015 and SCC** 2011 and implements projects in Germany and across Europe, including French overseas departments.
- Site
- Frankenthal
- Processes
- Piping Prefabrication (pipe parts/spools), Pipe Bends, CAD-Controlled Technical Processing, WIG Welding, MIG Welding, MAG Welding, E-Hand Welding, WIG-Orbital Welding
- Materials
- P23GH, 16Mo3, L3360NB, WB36, 13CrMo 4-5, 10CrMo 9-10, P5, P9
- Certificates
- ISO 9001:2015, SCC** 2011
- Founded
- 1987
- Employees
- 12
- Industries
- Chemical, Petrochemical, Energy and environmental technology, Power plant/CHP construction, Biodiesel/Biofuels, Wood industry (panel manufacturing)
- 01
Planning and detailed design
- 02
Project management
- 03
Prefabrication (spools, pipe bends, steel construction)
- 04
Welding
- 05
Testing (NDT, pressure testing, acceptance)
- 06
Packaging and transport
- 07
On-site assembly
- 08
Commissioning assistance
Sites

Frankenthal (Pfalz)
DEHeadquarters, manufacturing and administration
- Materials
- Heat-resistant steels, stainless steels, nickel alloys, titanium, plastics
- Workshop area in two halls (ca. 4,000 m²)
- Open area 10,000 m²
- 6 portal cranes up to 8 t
- Central gas supply
- Transport and lifting technology
- CAD-controlled technical processing
Components and Services




Inside the production








Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Piping Prefabrication (pipe parts/spools)Joining | – | – | – | – | WG 1 (P23GH; 16Mo3; L3360NB), WG 4 (WB36), WG 5 (13CrMo 4-5; 10CrMo 9-10; P5; P9), WG 6 (P91; P92), WG 8 (1.4301; 1.4541; 1.4571; 1.4563; 1.4591), Alloy 201, Alloy 800 (Inconel), Alloy 400 (Inconel), Titan, 1.4662 (Duplex), Plastics |
| Pipe BendsForming | – | – | – | – | – |
| CAD-Controlled Technical ProcessingMachining | – | – | – | – | metallic materials, Plastics |
| WIG WeldingJoining | – | – | – | – | metallic materials |
| MIG WeldingJoining | – | – | – | – | metallic materials |
| MAG WeldingJoining | – | – | – | – | metallic materials |
| E-Hand WeldingJoining | – | – | – | – | metallic materials |
| WIG-Orbital WeldingJoining | – | – | – | – | metallic materials |
| Non-Destructive Materials TestingTesting | – | – | – | – | – |
| Pressure Testing, AcceptanceTesting | – | – | – | – | – |
| Piping Construction (Planning to Assembly)Engineering | – | – | – | – | WG 1 (P23GH; 16Mo3; L3360NB), WG 4 (WB36), WG 5 (13CrMo 4-5; 10CrMo 9-10; P5; P9), WG 6 (P91; P92), WG 8 (1.4301; 1.4541; 1.4571; 1.4563; 1.4591), Alloy 201, Alloy 800 (Inconel), Alloy 400 (Inconel), Titan, 1.4662 (Duplex), Plastics |
| Industrial Assembly and Plant Construction (Plant assemblies, dismantling, commissioning assistance)Assembly | – | – | – | – | – |
| Vessel and piping construction, mechanical assembly (machines, aggregates, conveyor systems)Assembly | – | – | – | – | – |
| Insulation and paintingSurface | – | – | – | – | – |
| Steel construction: Manufacturing and assembly of welded components (pipe bridges, supportJoining | – | – | – | – | – |
| Corrosion protection and insulationSurface | – | – | – | – | – |
3 Anlagen & Maschinen
| Machine | Manufacturer / model | Quantity | Working area | Year built | Site |
|---|---|---|---|---|---|
| Portal Crane | – | 6 | Load capacity up to 8 t | – | Frankenthal |
| Workshop area (two halls) | – | – | around 4000 m² | – | Frankenthal |
| Open area | – | – | 10,000 m² | – | Frankenthal |
Additional services
Reference customers
Quality and Certification
The quality of the welding is secured by state-of-the-art technology and qualified, experienced staff; this includes non-destructive materials testing, pressure testing, acceptance, and documentation according to project specifications. The company is certified according to ISO 9001:2015 and SCC** 2011.
| Evidence | Frankenthal (Pfalz) |
|---|---|
| ISO 9001:2015 | |
| SCC** 2011 |
History
- 1987
Foundations of the company; active in piping construction, steel construction, and industrial assembly for over 35 years
- 2007
Assembly and piping of a superheater in Wörth (Josef Bertsch GmbH & Co.) incl. heavy lifting of approx. 420 t
- 2008
Biodiesel plants in Rotterdam (Clean Energy) and biomass boiler plants in Vielsalm (Belgium) completed
- 2009
Biodiesel plant Biopetrol Rotterdam (800,000 t/y) with Lurgi GmbH: Prefabrication and assembly of approx. 720 t piping
- 2017
Projects completed in Petfürdő (Hungary), Pratteln (Switzerland) and La Réunion for ThyssenKrupp, Uhde and YARA
- 2018
Projects GHKW Kiel Phase 2, WFA Elverlingsen and Haribo Grafschaft completed