Contract manufacturing in metal and plastic: CNC machining, welding up to 15 tonnes, flame-cut parts, blasting and painting.

Wenning Metall GmbH & Co. KG
Erbendorf (Plant I–III) · GermanyNew on Amplifa
About Wenning Metall
Wenning Metall is an owner-managed contract manufacturing company based in Erbendorf in the Upper Palatinate. The family business, founded in 1996, manufactures metal and, when required, plastic parts to sample or drawing – from prototype and single-piece production through to series production. The service portfolio includes CNC milling (workpieces up to 3,000 x 10,000 mm), CNC turning up to Ø 400 mm, MIG/MAG welding of welded parts up to 15 tonnes, plasma and oxy-fuel flame cutting in dimensions up to 3,000 x 6,000 mm as well as surface grinding and drilling. In addition, in-house facilities provide sandblasting and free-form blasting as well as industrial painting; surface and heat treatments such as browning, galvanizing, nickel plating and chrome plating are carried out by qualified partner companies. Wenning Metall also handles material procurement. Customers come from mechanical engineering, metal and steel construction and the automotive industry. Around 2,250 m² of production and warehouse space is available across three plants at the Erbendorf site.
- Site
- Erbendorf
- Processes
- Milling, Turning, Metal inert gas welding (MIG), Metal active gas welding (MAG), Plasma flame cutting, Oxy-fuel flame cutting, Industrial painting, Sandblasting / free-form blasting (through-feed blasting system)
- Materials
- Metal, Plastic, Flame cutting (plasma/oxy-fuel), Sandblasting / free-form blasting, Industrial painting, Surface / heat treatment (partner)
- Certificates
- ISO 9001
- Founded
- 1996
- Industries
- Mechanical engineering, Metal construction, Steel construction, Automotive industry
- 01
Material procurement
- 02
Flame cutting (plasma/oxy-fuel)
- 03
Blasting (through-feed / free-form blasting)
- 04
CNC milling
- 05
CNC turning
- 06
Drilling
- 07
Surface grinding
- 08
Welding (MIG/MAG)
- 09
Industrial painting
- 10
Delivery
Materials & Processes
Metal
Main material for milled, turned, welded and cut parts in contract manufacturing.
Plastic
Processed as required for components made to drawing.
Flame cutting (plasma/oxy-fuel)
Plasma 2–25 mm, oxy-fuel 25–150 mm, cut parts up to 3,000 x 6,000 mm in various materials.
Sandblasting / free-form blasting
Own through-feed blasting system WM DST 2000.800 for workpieces up to 2,000 x 800 mm.
Industrial painting
Surface coating of the manufactured workpieces on request.
Surface / heat treatment (partner)
Browning, galvanizing, nickel plating and chrome plating via qualified partner companies.
Sites

Erbendorf – Plant I
DEHeadquarters and production
- Lot size
- Single parts through to series
- Materials
- Metal, plastic
- Bed-type milling machine MTE BF 4200
- High-performance machining center Hedelius Acura 65
- Radial drilling machine Boweg
- MAG welding equipment (EWM, REHM)
- Surface grinding machine DANOBAT RT 1200
Erbendorf – Plant II
DEProduction hall (1,250 m², office 90 m²)

Erbendorf – Plant III
DEWarehouse hall (700 m²)
- Materials
- Metal, plastic
- Through-feed blasting system WM DST 2000.800
- Flame cutting system MicroStep MasterCut-X 6001.30PG
Components & Manufacturing Services






Inside the production






Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| MillingMachining | – | 3,000 x 10,000 mm (workpiece dimensions) | – | Single part – Series production | Metal, Plastic (as required) |
| TurningMachining | – | – | – | – | – |
| Metal inert gas welding (MIG)Joining | – | – | Welded parts up to 15 tonnes | – | – |
| Metal active gas welding (MAG)Joining | – | – | Welded parts up to 15 tonnes | – | – |
| Plasma flame cuttingMachining | – | 3,000 mm × 6,000 mm | – | – | various materials |
| Oxy-fuel flame cuttingMachining | – | 3,000 mm × 6,000 mm | – | – | various materials |
| Industrial paintingSurface | – | – | – | – | – |
| Sandblasting / free-form blasting (through-feed blasting system)Surface | – | 2,000 x 800 mm (workpiece size) | – | – | – |
| Single-piece production / prototype manufacturing to sample or drawingManufacturing | – | – | – | Single parts – Series production | Metal, Plastic |
| Browning (partner company)Surface | – | – | – | – | – |
| Galvanizing (partner company)Surface | – | – | – | – | – |
| Nickel plating (partner company)Surface | – | – | – | – | – |
| Chrome plating (partner company)Surface | – | – | – | – | – |
| CNC machining of turned and milled workpiecesMachining | – | – | – | – | – |
| Drilling (radial drilling machine)Machining | – | – | – | – | – |
| Surface grindingMachining | – | – | – | – | – |
| Material procurementEngineering | – | – | – | – | – |
8 Anlagen & Maschinen
| Machine | Manufacturer / model | Quantity | Working area | Year built | Site |
|---|---|---|---|---|---|
| Through-feed blasting system (sandblasting/free-form blasting) | WM DST 2000.800 | 1 | Workpieces up to 2000 x 800 mm | – | Erbendorf |
| Radial drilling machine | Boweg | – | – | – | – |
| MAG welding equipment | EWM | – | – | – | – |
| MAG welding equipment | REHM | – | – | – | – |
| Surface grinding machine | DANOBAT RT 1200 | – | – | – | – |
| Flame cutting system (plasma/oxy-fuel cut parts) | MicroStep MasterCut-X 6001.30PG | – | Cut parts 3,000 x 6,000 mm | – | – |
| Bed-type milling machine | MTE BF 4200 | – | – | – | – |
| High-performance machining center | Hedelius Acura 65 | – | – | – | – |
Additional services
Quality
Wenning Metall manufactures with professional precision to drawing, from prototype to series production, and places emphasis on on-time processing and close customer contact from consulting through to delivery. Certifications are not documented.
| Evidence | Erbendorf |
|---|---|
| ISO 9001 |
History
- 1996
Founding of the company Wenning
- 2000
Settled as one of the first companies in the new Erbendorf industrial park with 300 m² of production and 60 m² of office space
- 2008
Extension of the hall to a total of 800 m² of production space
- 2012
Extension of the administration building to a total of 120 m²
- 2017
Construction of another production hall with 1,340 m²
- 2019
Construction of production hall Plant II with 1,250 m² and office space of 90 m²
- 2019
Conversion of an existing warehouse hall, Plant III, with 700 m²
- 2022
Renaming from Wenning Metall to Wenning Metall GmbH & Co. KG