Timber house construction, carpentry and hall construction in solid timber and timber-frame construction from Otterfing.

Zimmerei Stefan Walter GmbH & Co. KG
OtterfingNew on Amplifa
About Zimmerei Stefan Walter
Zimmerei Stefan Walter GmbH & Co. KG is a craft-based timber construction company headquartered in Otterfing in the Bavarian Alpine foothills. Since its founding in 1996, the 14-member team with three master carpenters has realized building projects in solid timber and timber-frame construction — from planning through prefabrication of timber-frame walls to assembly and handover. The range of services covers the complete turnkey construction of new timber houses, rooftop extensions and penthouse additions in timber-frame construction, annexes and conversions, roof and old-building renovation, classic carpentry work such as roof truss erection, interior fit-out of new buildings, the installation of roof windows, as well as hall construction for commerce, trades and agriculture. Work is carried out using timber as a building material and ecological insulation materials. In addition, the company operates an agricultural contracting business offering mowing, swathing, baling, slurry and manure spreading, as well as the brokerage and sale of hay, straw and pellets. Through the Environmental and Climate Pact of Bavaria, the company is committed to ecological sustainability.
- Site
- Otterfing
- Processes
- Timber house construction (solid timber and timber-frame construction), Classic carpentry (roof truss erection etc.), Prefabrication of timber-frame walls, Rooftop extension in timber-frame construction, Roof and old-building renovation, Annexes and conversions, Hall construction, Interior fit-out of new buildings
- Materials
- Wood, Ecological insulation material, Hay, Straw, Aftermath hay, Grass or maize pellets (Cops)
- Certificates
- Environmental and Climate Pact of Bavaria
- Founded
- 1996
- Employees
- 14
- Industries
- Construction / residential construction, Commerce / trades, Agriculture
- 01
Planning
- 02
Prefabrication of timber-frame walls
- 03
Assembly
- 04
Interior fit-out
Materials and Working Methods
Wood
Main material for timber house construction, roof trusses, rooftop extensions and hall construction in solid timber and timber-frame construction.
Ecological insulation material
Used in timber-frame buildings, already installed in 1999 in the company founder's own home.
Locations
Otterfing
DEHead office: carpentry workshop and office building with showroom
- Materials
- Wood, ecological insulation material
- Fendt 820 (contracting business)
- McHale Fusion 3++ baling-wrapping combination
- Mower with conditioner (8.60 m)
- Large swather
- Large bale press (bale format 0.70 m x 1.20 m)
Industries
Processes & technical limits
| Processes | Tolerance | Max. part | Weight | Lot size | Materials |
|---|---|---|---|---|---|
| Timber house construction (solid timber and timber-frame construction)Assembly | – | – | – | – | Wood |
| Classic carpentry (roof truss erection etc.)Assembly | – | – | – | – | Wood |
| Prefabrication of timber-frame wallsAssembly | – | – | – | – | Wood |
| Rooftop extension in timber-frame constructionAssembly | – | – | – | – | Wood |
| Roof and old-building renovationAssembly | – | – | – | – | Wood |
| Annexes and conversionsAssembly | – | – | – | – | Wood |
| Hall constructionAssembly | – | – | – | – | Wood |
| Interior fit-out of new buildingsAssembly | – | – | – | – | Wood |
| Roof window installationAssembly | – | – | – | – | – |
| Planning (building with wood, from planning to assembly)Engineering | – | – | – | – | – |
| Mowing with conditioner (8.60 m wide)Other | – | – | – | – | – |
| Swathing with large swatherOther | – | – | – | – | – |
| Pressing and wrapping of silage bales with McHale Fusion 3++Other | – | – | – | – | – |
| Pressing of hay and straw bales with large bale press 0.70 m x 1.20 mOther | – | – | – | – | – |
| Slurry spreading with trailing shoe or spreaderOther | – | – | – | – | – |
| Spreading of manure and compostOther | – | – | – | – | – |
| Hay and straw transportsOther | – | – | – | – | – |
6 Anlagen & Maschinen
| Machine | Manufacturer / model | Quantity | Working area | Year built | Site |
|---|---|---|---|---|---|
| Tractor | Fendt 820 | – | – | – | Otterfing |
| Baling-wrapping combination | McHale Fusion 3++ | – | – | – | Otterfing |
| Mower with conditioner | – | – | 8.60 m wide | – | Otterfing |
| Large swather | – | – | – | – | Otterfing |
| Large bale press | – | – | Bale format 0.70 m x 1.20 m | – | Otterfing |
| Trailing shoe / spreader (slurry spreading) | – | – | – | – | Otterfing |
Additional services
Reference customers
Quality and Environment
Since 2022, the company has been a signatory of the Environmental and Climate Pact of Bavaria and, with three master carpenters, ensures professional and master-level quality of execution. Statutory warranty applies to construction services.
| Evidence | Otterfing |
|---|---|
| Environmental and Climate Pact of Bavaria |
History
- 1996
Founding of Zimmerei Stefan Walter in Otterfing, initially in a tractor garage
- 1999
Stefan Walter builds his own home as a timber-frame house with ecological insulation material
- 2022
Receipt of the Environmental and Climate Pact of Bavaria certificate
- 2024
Occupancy of a new office building including showroom; open day on 12 May 2024