Skip to content
NEW: CREATE AN AI-ASSISTED TENDER IN 2 MINUTES — TRY IT FREE
Back to search
Menner Tiefbau – Fertigung

Pipeline civil engineering, fibre-optic expansion, vacuum excavator and flush drilling work as well as road and paving construction from a single source

Menner Tiefbau Logo

Menner Tiefbau GmbH

Breisach-OberrimsingenNew on Amplifa

1958Founded
50 employees, 5 apprenticesWorkforce (2021)
1 siteBreisach-Oberrimsingen
16 Bagger, 2 Saugbagger, 10 LKW, 20Machinery and vehicle fleet

About Menner Tiefbau GmbH

Menner Tiefbau GmbH from Breisach-Oberrimsingen is an owner-managed family business in its third generation and has been active in civil engineering since 1958. Its range of services covers pipeline civil engineering (cable and pipe trenches for telecommunications, water, gas and sewage), fibre-optic expansion up to the FTTH house connection, cable installation and overhead line construction, electrical installation work, non-destructive excavation with vacuum excavators, horizontal flush drilling, drainage construction as well as asphalt and paving work. All work is handled from a single source, from consulting and planning through execution to completion. The machinery fleet includes, among other things, 16 excavators (2–25 t), two vacuum excavators with 8 m³ container volume, wheel loaders, rollers and asphalt pavers. Customers are about 95% public-sector bodies such as Deutsche Bahn, Deutsche Telekom, ESAG and municipal companies; the operating area is southern Baden up to Lörrach and Offenburg.

Site
Breisach-Oberrimsingen
Processes
Pipeline civil engineering (cable and pipe trenches for telecommunications, water, gas, sewage,, Fibre-optic expansion / FTTH (Fiber to the home), Vacuum excavator work (non-destructive excavation), Flush drilling / horizontal flush drilling (laying of protective and media pipes), Cable installation + overhead line construction, Asphalt work / road construction, Paving work (e.g. large-format pavers, small-format pavers in bonded construction, Rhine pebbles,, Electrical installation work
Materials
Fibre-optic cables, Copper cables, Coaxial cables, Power cables 0.4kV to 20kV, Asphalt, Natural stone paving, Rhine pebbles, Power cables
Certificates
Services from a single source (planning to installation)
Founded
1958
Employees
50
Industries
Civil engineering, Telecommunications network construction (FTTH/fibre optic), Power cable construction (0.4–20 kV), Water/gas/sewage, Road and paving construction
  1. 01

    Consulting and planning

  2. 02

    Earthworks and shoring / pipeline civil engineering

  3. 03

    Flush drilling / vacuum excavator work

  4. 04

    Cable laying and cable installation

  5. 05

    Surface restoration (asphalt/paving)

  6. 06

    Electrical installation and house connections

  7. 07

    Acceptance and documentation

Materials and Media

Gfk

Fibre-optic cables

Laying and installation as part of FTTH broadband expansion up to the house connection.

Cu

Copper cables

Laying and installation for telecommunications networks since the start of installation work in 2010.

Koax

Coaxial cables

Installation for telecommunications and cable network operators.

0,4–20 kV

Power cables

Laying of power cables from 0.4 kV to 20 kV including installation work.

Asphalt

Asphalt

Installation of asphalt surfaces with our own pavers in road construction.

Naturstein

Natural stone paving / Rhine pebbles

Paving work in bonded construction, e.g. in Freiburg city centre.

DN180

Water pipes and pipe ducts

Laying of water pipes up to DN180 as well as pipe ducts for all media.

Site

Standort Breisach-Oberrimsingen

Breisach-Oberrimsingen

DE

Head office with machinery and vehicle fleet

Materials
Fibre-optic cables, copper cables, power cables, asphalt, natural stone paving
  • 16 excavators (2–25 t)
  • 2 vacuum excavators (8 m³)
  • 8 wheel loaders
  • 10 trucks (7.5–32 t)
  • 20 vans
  • 6 rollers
  • 2 asphalt pavers
  • Drilling rig (flush drilling)
  • Cable plough (Ditch Witch)
  • Trench milling machine (Höss)
  • Screening plant
  • Low-loader
  • Lift platform

Services and Components

Pipeline civil engineering: cable and pipe trenches
Pipeline civil engineering: cable and pipe trenchesOpen construction method · Telecommunications / utilities and waste disposal
Horizontal flush drilling
Horizontal flush drillingClosed construction method · Pipe laying up to 450 mm diameter
Vacuum excavator work
Vacuum excavator workNon-destructive excavation · Utility network / civil engineering
Cable laying and cable installation
Cable laying and cable installationFibre optic/copper · Telecommunications (FTTH)
Asphalt work
Asphalt workRoad construction · Infrastructure
Paving work
Paving workNatural stone/Rhine pebbles · Urban development

Inside the production

Excavator work
Excavator work
Drainage construction
Drainage construction
Cable installation and overhead line construction
Cable installation and overhead line construction
Asphalt work
Asphalt work
Machinery and vehicle fleet
Machinery and vehicle fleet
Flush drilling
Flush drilling
Paving construction
Paving construction

Industries

Civil engineeringTelecommunications network construction (FTTH/fibre optic)Power cable construction (0.4–20 kV)Water/gas/sewageRoad and paving construction

Processes & technical limits

ProcessesToleranceMax. partWeightLot sizeMaterials
Pipeline civil engineering (cable and pipe trenches for telecommunications, water, gas, sewage,Engineering––––Cables and supply lines, Pipe ducts
Fibre-optic expansion / FTTH (Fiber to the home)Engineering––––Fibre-optic cables, Fibre-optic lines, Power cables
Vacuum excavator work (non-destructive excavation)Engineering–––––
Flush drilling / horizontal flush drilling (laying of protective and media pipes)Engineering–Diameter up to 450 mm (horizontal––Protective pipes, Media pipes, Water pipes
Cable installation + overhead line constructionInstallation––––Copper cables, Fibre-optic cables, Coaxial cables, Power cables 0.4kV to 20kV
Asphalt work / road constructionEngineering––––Asphalt
Paving work (e.g. large-format pavers, small-format pavers in bonded construction, Rhine pebbles,Engineering––––Natural stone, Rhine pebbles, Large-format pavers, Small-format pavers
Electrical installation workInstallation–––––
Drainage constructionEngineering–––––
Culvert construction under watercourses in open and closed construction methodsEngineering–––––
Excavator work / earthworks and shoringEngineering–––––
Ploughing work in unpaved surfaces (cable plough)Engineering–––––
Laying of power cables 0.4kV to 20kV incl. installation workInstallation––––Power cables 0.4kV to 20kV, 20kV cables (dual system)
Laying of water pipesEngineering–up to DN180mm––Water pipes
Construction of utility trenches in inner-city areasEngineering–––––
Construction of FTTH house connections and power house connectionsInstallation–––––
Supply and installation of cable shafts, assembly of multifunctional cabinetsInstallation––––Cable shafts, Multifunctional cabinets
Construction of irrigation systemsEngineering–––––
Consulting and planning of construction projectsEngineering–––––

16 Anlagen & Maschinen

MachineManufacturer / modelQuantityWorking areaYear builtSite
Excavators (mobile excavators)–162 – 25 tonnes operating weight–Breisach-Oberrimsingen
Vacuum excavators–28 m³ container volume–Breisach-Oberrimsingen
Wheel loaders–8––Breisach-Oberrimsingen
Trucks–107.5 – 32 tonnes gross weight–Breisach-Oberrimsingen
Vans–20––Breisach-Oberrimsingen
Rollers–6––Breisach-Oberrimsingen
Asphalt pavers–2––Breisach-Oberrimsingen
Smarts–2––Breisach-Oberrimsingen
Drilling rig (flush drilling rig)FlowTex1–1994 (ErstBreisach-Oberrimsingen
Lift platforms––––Breisach-Oberrimsingen
Cable trailers––––Breisach-Oberrimsingen
Low-loaders––––Breisach-Oberrimsingen
Screening plants––––Breisach-Oberrimsingen
Trench milling machineHöss1–1963Breisach-Oberrimsingen
Cable ploughDitch Witch––1972 (ErstBreisach-Oberrimsingen
Loader dozer–1–1962 (ErstBreisach-Oberrimsingen

Additional services

Pipeline civil engineeringCable installationOverhead line constructionFibre-optic cable expansion (FTTH)Vacuum excavator workFlush drilling (horizontal drilling)Asphalt work/road constructionPaving workElectrical installation workDrainage constructionHouse connections (power/telecom)Planning and consulting from a single source

Reference customers

Deutsche BahnUniversitiesDeutsche TelekomUnitymediaESAGMunicipal utilities DresdenMunicipal utilities MeißenMunicipal utilities LeipzigCity and municipal administrationsEnergy and telecommunications companies

Quality

Projects are completed on schedule with our own qualified personnel and a modern, continuously updated machinery fleet; as a road construction trade business led by a master craftsman, the company works in accordance with the recognised rules of technology.

EvidenceBreisach-Oberrimsingen
Services from a single source (planning to installation)

Company History

  1. 1958

    Founding of a transport company with 3 vehicles by Theodor Menner

  2. 1962

    Purchase of the first loader dozer

  3. 1963

    Acquisition of the first trench milling machine of the Höss brand

  4. 1968

    Hermann Menner joins the company

  5. 1970

    Expansion into irrigation systems and drainage work nationwide

  6. 1972

    Purchase of the first cable plough from Ditch Witch

  7. 1986

    Founding of a branch in France (Cablé France)

  8. 1988

    Handover of the business to son Hermann Menner

  9. 1989

    Network expansion in Saxony for Deutsche Telekom, ESAG and municipal utilities in Dresden, Meißen and Leipzig

  10. 1994

    Purchase of the first flush drilling rig from FlowTex, first flush drillings in Rastatt

  11. 1998

    First overhead line work

  12. 2010

    Start of telecommunications installation work for Telekom and Unitymedia

  13. 2014

    Tim Menner completes his master craftsman qualification in road construction

  14. 2016

    Handover of the business to Tim Menner (3rd generation)

  15. 2020

    Conversion to GmbH; second vacuum excavator

  16. 2021

    50 employees and 5 apprentices

Try it now

Test Amplifa Marketplace – no appointment needed.

From a structured request to the right manufacturing partner: AI-assisted matching, verified suppliers and transparent metrics — sign up in minutes and start on your own.

Create your free account